Science

How engineers test a bridge before it opens

Heavy trucks, sensors and careful measurements check that the structure behaves as designed.

How engineers test a bridge before it opens

Photo: Unsplash · Unsplash License

A new bridge is designed with calculations, but engineers still check how the real structure behaves before traffic arrives.

Load testing

Loaded trucks are parked or driven across in planned positions to put a known weight on the bridge.

Measuring the bend

Sensors record how far the deck bends and whether it springs back. The results are compared with the design.

Inspections

Welds, bolts, bearings and joints are checked for defects before and after the test.

Monitoring for years

Many modern bridges keep sensors in place so engineers can spot changes long after opening.

Filed underScience
Share this story
Sources and corrections. This article draws on the sources listed here. Spotted a mistake? and we will correct it.
  1. 1 Sample source: background reference Reference
  2. 2 Sample source: official or primary document Reference
  3. 3 Sample source: explainer from another publisher (facts only) Reference